Technique City - تكنيك سيتي
ع
Compacting Bins & Stores in Mina
mosqueHoly Sites & Hajj

Compacting Bins & Stores in Mina

Equipping and managing a network of compacting bins and balers to handle and empty waste in the million-person environment serving pilgrims, with tightly controlled periodic emptying that prevents any build-up or emissions.

corporate_fare
ClientHoly Capital Municipality
place
LocationMina and the main pilgrim routes
category
SectorHoly Sites & Hajj
event_available
Year delivered2022
flag
Project statusRecurring seasonal operation
01descriptionProject overview

Technique City manages the network of ground-level compacting bins and balers in Mina, ensuring a clean and safe environment for pilgrims during the peak of the million-person season.

The system relies on tightly controlled periodic emptying along precise routes that do not conflict with pilgrim movement, with immediate sanitisation protocols that prevent insect gathering and emissions.

Compaction and emptying volumes exceed 120 tonnes per day at the season's peak, using a hydraulic lifting fleet fitted with satellite tracking to guarantee adherence to schedules.

Compacting Bins & Stores in Mina — image 1
02engineeringScope of work and engineering delivery

Operating and maintaining the network of ground-level compacting bins and balers with continuous emptying along precise routes that do not conflict with pilgrim movement, and full documentation of every emptying cycle.

03timelineDelivery phases
  1. 1

    Bin & compactor distribution

    Identifying critical locations and distributing compacting bins according to crowd density.

  2. 2

    Emptying route scheduling

    Programming precise routes that do not conflict with pilgrim movement throughout the day.

  3. 3

    Operation & sanitisation

    Tightly controlled periodic emptying and immediate sanitisation protocols throughout the season.

  4. 4

    Documentation & follow-up

    Documenting emptying cycles and submitting compliance reports to the Municipality.